Scheduling Calendar

 Scheduling Sheet

 Holidays 2010 to 2015

 The Cabin
   What to do when you Arrive

   What to do when you Leave

 To Do Items
   -Now-Later-Someday


 Map Page

 Weather Averages

 Links

 Cabin Pictures

 Family Picture Page

 Back to Home Page


Work List that needs to be done in the Spring at the cabin

  • Open up the Cabin
  • Firewood
  • Coat the deck in the Spring
  • Rake Pine needles and Pine cones
  • Fix the dock from Winter abuse
  • Replace some Dock boards
  • Install a real ladder


Work List that needs to be done in the Fall at the cabin

  • Coat the deck in the Fall
  • Fix the dock from Summer use




  • Close up the Cabin


Items we would like to do Sometime at the cabin

  • Insulate the floor where the pipes are and the pipes








PO Box 910 Monroe, WA. 98272

Email Colleen at ColleenC@VacationShop.com

Back to Home Page